rocket
our feature

why choose us

Global reach and local presence

Reactor core and critical infrastructure below ground providing greater protection.

customer user experience

Proprietary valve designs provide continuous flow of heat from the core, even during loss of cooling or pressure.

fast & Flexible solutions

Proprietary dedicated gas-to-water heat exchanger provides continuous cooling even during loss of electrical power.

wellcome to tierria energy

New Thorium Power Plants

  Tierria energy is offering to build, operate and license utilizing construction –ready blueprints and proprietary software systems design for Thorium Power Plant. In addition, we propose to upgrade all of the existing power generation facilities in your country. This design will utilize modular thorium reactors that will produce economically safe, clean, and abundant energy.

Read more
bulk
our offer

what we offer

Get our best offer for your better business

We can also fund many types of projects, such as potable water facilities, airports, and roads and other civil infrastructure.

  • Traditional Nuclear Plants: Fuel requirements 250 tons of Natural Uranium with 35 tons of spent nuclear fuel needing long term storage (10,000 to a million years).
  • Thorium-fueled plant: Fuel requirements is 1 ton of natural Thorium The LFTR converts thorium to uranium and burns it which results of 1 ton of fission products free of plutonium. Within 10 years, 83% of fission products are stable and can be used in industry or medicine.

The balance requires storage of 300 years.

offer

100+

Support Countries

35k

happy customers

230

total project done

658

team members

Let's start

Upgrade New Thorium Power Plants.

send us your message text

    Advantages

    • Reduced waste accumulation.
    • No meltdown possibility.
    • Scalable from 1 -100 Mw.
    • Low operating pressure – 200 psi
    • Solid fuel design.
    • Modular in design, improve shipping logistics
    • Long operating lifecycle (60 years).
    • Inert gas acts as heat transfer medium.
    • “Breed & Burn” technology produces new fuel.


    Thorium
    4,500MW
    Nuclear
    1,000MW
    Solar
    1,000MW
    Wind
    1,000MW
    Hydro
    1,000MW
    Plant set Time 18-24 months 5 -7 years 3 years 3 years 5-7 years
    Set up Cos
    Maintenance Cost 60% less Very Expensive Expensive Very Expensive Very Expensive
    Life Span 60 years 30 years 15-20 years 15-20 years 30-40 years
    Productivity 98.5%/24h /365 to the National Grid 91%/24h/ 365 to the National Grid 00%/6-8h with seasonal variation 00% depends on wind 00% with seasonal variation
    Tariff Rate US$0.010 US$0.095 US$0.095 US$0.095 US$0.0
    Eco Friendliness 99.99%
    Toxic Waste None Very high None None None
    Switch On/Off Time 60 seconds Few hours Few hours Few hours Few hours